top of page
Fabric.jpg

Turnkey Chemical Production Lines Worldwide

We design, build and commission complete oilfield chemical manufacturing facilities - from R&D formulation to full-scale production 500 to 25,000 MT/year capacity, delivered in 8 to 20 months and

with 97% commissioning success

Know-How Transfer & Technology Licensing

NRG's core asset is its proprietary formulation and production methodology of upstream chemicals and equipment.

We make this technology available through structured licence agreements

1 / Cementing Additives

Full pack of cementing line: fluid loss control, retarders, defoamers accelerators, dispersants, extenders, spacers

2 / Drilling Fluids and Materials

Viscosifiers, emulsifiers, shale inhibitors, mechanical lubricants, drill-in fluid systems, defoamers and lost circulation materials

3 / Stimulation and Acidizing

Gelling agents, corrosion inhibitors,

scale inhibitors, iron stabilizers,

H2S scavengers

4 / Fracturing Fluids

Synthetic polymers, crosslinkers, breakers, friction reducers, pure liquid technology systems

5 / Well Completion Equipment

Dissolvable alloy technology including frac plugs, 100 MPa frac balls, liner filter plugs and dissolvable smart darts

6 / Partnership & Go-to-Market

R&D, support for product registration, technical data sheets, field trials, pricing strategy and market entry

Case Studies: Recent Delivered Projects

Each project was delivered from initial R&D through full-scale production, with NRG managing every stage of the process

Fluid Loss Facility.jpg

Cementing - Location UAE

Fluid Loss Control Production Line

Complete production facility for full-temperature AMPS-based synthetic fluid loss additive used in primary cementing operations

Crosslinker Facility.jpg

Fracturing - Location Kazahstan

Crosslinker Manufacturing Plant

Turnkey facility for fracturing crosslinker production designed for regional oilfield supply. From recipe research up to production and market strategy

Microsilica.jpg

Cementing - Location Kuwait

Liquid Microsilica Blending Facility

Production line for stable liquid microsilica cement additive with batching, mixing, QC and packaging. Replacing an imported product with a local one, registration of a new brand and manufacturer

Six Stages from Concept
to Commercial Production

Every project follows a rigorous stage-gate methodology - ensuring technical, commercial, and regulatory readiness at each milestone before proceeding to the next phase

R&D &
Formulation

Proprietary synthesis, lab-scale testing, product optimization and IP documentation for target chemistry

Market
Assessment

Demand analysis, competitive landscape, raw material sourcing, regulatory environment and feedstock availability

Plant Design
& Engineering

FEED, detailed engineering, process flow diagrams, P&IDs, HAZOP, layout design and technical specifications

Equipment
Selection

Process equipment specification, vendor qualification, procurement support, inspection and logistics coordination

Construction
& Assembly

Site construction management, mechanical completion, utility connections, instrument loop checks and pre-commissioning

Commissioning
& Production

Start-up under NRG author's supervision, first batch qualification, QC protocol handover and operator training

Ready
to localize
chemical
production?

Turn your idea in real project. Contact our Engineering team: nrg-int.com

bottom of page